I once told my manager a feature would take two weeks. It took three months.
Not two and a half weeks. Not a month. Three months. The project that was supposed to ship before the holidays launched in March. The roadmap was destroyed. Relationships were strained. My credibility took a hit that took over a year to fully repair.
The worst part was that I knew better. I had been a developer for years. I had read all the articles about multiplying your estimates. I understood that software is unpredictable. And I still gave an estimate that was off by a factor of six.
If you have been writing code for any length of time, you have your own version of this story. Maybe the scope was not as dramatic, but you have felt the sinking realization that you are not going to make the deadline you committed to. You have had the uncomfortable conversation where you explain that things are taking longer than expected. You have watched your credibility erode one missed estimate at a time.
This article is not about estimation techniques. You already know to break tasks into smaller pieces. You already know that estimates are uncertain. What you probably do not know is why you keep giving bad estimates despite knowing better, how to communicate estimates in ways that protect your credibility, what to say when you realize you are going to miss a deadline, and how to recover when you have already damaged trust.
These are the things that actually determine whether estimates help or hurt your career. Let me show you what I have learned.
Why Smart Developers Give Bad Estimates
Before we can fix the problem, we need to understand why it happens. And it happens to everyone, not just junior developers. Some of the worst estimation failures I have witnessed came from developers with decades of experience.
The planning fallacy is real and universal. Psychologists have studied this extensively. When humans estimate how long something will take, we consistently underestimate, even when we have direct experience with similar tasks taking longer than expected. We focus on the ideal scenario where everything goes right and systematically ignore the realistic scenario where things go wrong.
This is not stupidity. It is how human brains work. We simulate the future by imagining ourselves doing the task, and that simulation runs smoothly because we are not actually encountering the problems yet. The integration that will fail, the requirement we misunderstood, the dependency that is not ready, none of these appear in our mental simulation.
Optimism feels good and caution feels weak. When someone asks how long something will take, there is social pressure to give an answer that sounds good. Saying "two weeks" feels confident and competent. Saying "I'm not sure, maybe four to six weeks" feels uncertain and evasive.
This pressure is often unspoken but powerful. We want to be seen as capable. We want to please the person asking. We want to believe we are fast and efficient. So we give the optimistic estimate that makes everyone feel good in the moment and creates problems later.
We estimate the work but forget everything else. When you estimate a feature, you probably think about writing the code. But the actual elapsed time includes code review cycles, waiting for design clarification, unexpected bugs, meetings that interrupt your focus, other priorities that take precedence, and the inevitable context switching tax.
A task that requires eight hours of focused coding might take two weeks of calendar time once you account for everything else. But when asked for an estimate, we give the eight hours because that is the work we are imagining.
We anchor on what people want to hear. If a PM asks "Can you get this done by Friday?" our brain treats Friday as an anchor. We start from Friday and look for reasons why we might make it rather than starting from the work and calculating when it might actually be done.
This anchoring effect is particularly dangerous because it often happens unconsciously. We do not realize we are being influenced by the question itself. We think we are giving an objective estimate when we are actually negotiating against ourselves.
Past success creates overconfidence. If you shipped a similar feature quickly once, you expect to do it again. But that success might have been an outlier. Everything went right that time. The requirements were clear, the codebase cooperated, no emergencies interrupted you. Treating your best case as your expected case guarantees future disappointment.
Understanding these psychological forces is the first step to countering them. You cannot eliminate bias entirely, but you can build systems and habits that account for it.
From Intuition to Calculation: The Three-Point Method
Most developers give a "most likely" number, hoping everything goes according to plan. But professional estimation must account for risk. To stop your forecasts from destroying your reputation, start using the PERT (Program Evaluation and Review Technique).
Instead of one number, define three:
-
Optimistic (O): You’re in the flow, no interruptions, and the code works the first time.
-
Most Likely (M): Your usual pace with standard daily overhead.
-
Pessimistic (P): Tests fail, dependencies break, or you hit a major architectural snag.
The Real Cost of Bad Estimates
Many developers treat estimates as a necessary annoyance. They give numbers to satisfy managers and then do the actual work however long it takes. This attitude is understandable but self-defeating.
Estimates affect your reputation more than your code. This sounds backwards, but it is true. Your manager probably cannot evaluate your code quality directly. They can evaluate whether you deliver what you said you would deliver when you said you would deliver it. Every missed estimate is a visible failure, regardless of how good the underlying code is.
Over time, patterns emerge. Some developers become known as reliable. When they say something will take a week, it takes a week, maybe plus or minus a day. Others become known as optimists whose estimates need to be doubled before being communicated upward.
Which reputation do you want?
Bad estimates destroy planning for everyone else. Your estimate does not exist in isolation. It feeds into roadmaps, marketing plans, sales commitments, and hiring decisions. When your two week estimate becomes three months, the damage cascades through the organization.
Other teams that were waiting for your feature have to revise their plans. The launch that was announced publicly has to be delayed. Resources that were allocated based on certain timelines are now misallocated. Your individual miss becomes everyone's problem.
Chronic underestimation leads to burnout. When you consistently underestimate, you are constantly behind. There is always pressure to catch up. Weekends get sacrificed. Quality gets compromised. The sustainable pace that prevents burnout becomes impossible because you are always racing to meet commitments you should not have made.
This is one of the hidden connections between estimation skill and developer burnout. Learning to estimate accurately is not just about credibility. It is about creating space for sustainable work.
Trust is hard to rebuild. Once you have a reputation for unreliable estimates, changing that reputation takes a long time. Every future estimate is viewed with suspicion. Your manager adds buffer without telling you. Your PM assumes you are being optimistic and communicates different numbers upstream. You lose control of your own narrative.
The good news is that estimation is a skill that improves with deliberate practice. The developers who become known as reliable estimators are not magically better at predicting the future. They have learned techniques and communication patterns that set realistic expectations and protect their credibility even when things go wrong.
How to Think About Estimates Differently
The biggest shift in my estimation accuracy came when I stopped thinking of estimates as predictions and started thinking of them as communication tools.
An estimate is not a promise. It is a probability distribution. When you say "two weeks," you are not saying the task will definitely take two weeks. You are saying something about likelihood within a range. The problem is that everyone hears a promise when you say a number.
This is why adding uncertainty language matters so much. "Two weeks" sounds like a commitment. "My best guess is around two weeks, but there is significant uncertainty because we have not done the technical investigation yet" sounds like what it actually is: an estimate with acknowledged uncertainty.
Understand what the asker actually needs. When someone asks for an estimate, they usually have a specific reason. Maybe they need to know if something can ship before a conference. Maybe they need to staff the project appropriately. Maybe they need to communicate a timeline to a customer.
Understanding the underlying need changes how you should respond. If they need a hard deadline for a conference, you might give a conservative estimate of what can definitely be done by that date, with stretch goals if things go well. If they need staffing information, you might give a range and discuss what would make it shorter or longer.
Asking "What do you need this estimate for?" is not evasion. It is gathering requirements that help you give a more useful answer.
Separate the types of uncertainty. Some uncertainty comes from not knowing how long the work itself will take. Other uncertainty comes from not knowing exactly what the work is. These require different responses.
If the requirements are clear but the implementation is uncertain, you can give a range and explain what would push toward each end. If the requirements themselves are unclear, you should say so explicitly and propose a bounded investigation to reduce uncertainty before estimating.
Think in terms of confidence levels. Instead of giving a single number, train yourself to think in terms of confidence intervals. What is the 50% estimate where half the time you would finish faster and half the time slower? What is the 90% estimate that you would beat nine times out of ten?
The 50% estimate is what most people give by default. It is the "if things go normally" number. The 90% estimate is much larger because it accounts for things not going normally. Sharing both numbers communicates uncertainty more honestly than a single point estimate.
Scripts for Common Estimation Conversations
Theory is useful, but when you are sitting in a meeting and someone asks "How long will this take?" you need specific words to say. Here are scripts for common situations that I have refined over years of awkward conversations.
When You Have No Idea
The worst thing you can do when you have no idea is pretend you do. Making up a number to avoid looking uncertain will haunt you when the number turns out to be wildly wrong.
What not to say: "Uh, maybe like... three weeks?"
What to say instead: "I don't have enough information to estimate this responsibly yet. I need to dig into the codebase and understand the integration points. Can I get back to you tomorrow with a more informed estimate?"
Or if they need a number immediately: "Without investigation, my gut says two to six weeks, but that range is so wide because there are several unknowns. The main uncertainties are X, Y, and Z. Can I spend a day investigating so I can narrow this down?"
This response demonstrates professionalism rather than uncertainty as weakness. You are showing that you take estimates seriously and will not give meaningless numbers just to fill silence.
When the Timeline Is Unrealistic
Sometimes you are asked if you can meet a deadline that you know is unrealistic. The pressure to say yes is enormous. The PM looks hopeful. The stakeholder is in the room. Everyone wants to hear that it is possible.
What not to say: "Sure, I can try" or "I'll do my best" (both of which sound like yes but give you deniability).
What to say instead: "That timeline is very aggressive for the full scope. I can definitely deliver X by that date. Y is possible but risky. Z would require cutting corners that I think we would regret. Which matters most?"
This response reframes the conversation from "can you meet this deadline" to "what can we achieve within this deadline." It gives the asker options rather than a simple yes or no. It demonstrates that you understand priorities and tradeoffs.
When a Manager Pushes for a Shorter Estimate
Sometimes the pressure is explicit. "We really need this in two weeks. Can you make it happen?" The implication is that a good team player would find a way.
What not to say: "Okay, I'll figure it out." (You won't, and now you have committed to an impossible deadline.)
What to say instead: "I understand the urgency. Two weeks would require everything to go perfectly, which is unlikely. My realistic estimate is four weeks. If two weeks is truly the hard constraint, let me tell you what we would need to cut or what risks we would be taking."
This response acknowledges the pressure without caving to it. You are not saying no. You are explaining the tradeoffs clearly so the decision maker can make an informed choice. If they decide to accept the risks, that is their call. Your job is to make sure they understand what they are deciding.
When Asked to Estimate Someone Else's Work
Sometimes you are asked to estimate for a project that will be implemented by someone else, or by a team. This is particularly tricky because you are accountable for the estimate without control over the execution.
What not to say: A confident single number that assumes the other person works exactly like you would.
What to say instead: "I can give you my estimate if I were doing this work, which is X. But I'm not the one implementing it, so I'd recommend checking with the actual team. Different people work at different speeds, and they might see complexities I don't."
This protects you from being blamed for misestimates when you did not control the execution. It also shows awareness that estimates are person-dependent, which is a sign of estimation maturity.
When Asked for an Estimate in a Group Setting
Public estimation is the worst. There is pressure to look confident. There is no time to think. Whatever you say is now committed in front of witnesses.
What not to say: The first number that pops into your head.
What to say instead: "I want to give you a reliable number rather than a guess. Let me think about this for a few hours and follow up by end of day. I can tell you right now that it is at least X, but I need to work through the details before committing to an upper bound."
This buys you time without looking evasive. You are being responsible, not uncertain. Most people will respect this, and the ones who insist on an immediate number despite your reasonable request are revealing something about how they will treat you throughout the project.
What to Do When You Realize You Are Going to Miss the Deadline
Despite your best efforts, you will sometimes realize mid-project that your estimate was wrong. The deadline is approaching and you are not going to make it. What you do in this moment has enormous impact on your credibility.
The cardinal rule is to communicate early. The moment you realize there is a significant risk of missing the deadline, say something. Not when you are certain you will miss it. When you realize there is a risk.
Early warning preserves options. Maybe scope can be reduced. Maybe resources can be added. Maybe the deadline can move. But these options only exist if there is time to exercise them. Waiting until the last minute eliminates them.
Do not hope the problem will solve itself. This is the most common mistake. You see that you are behind, but you tell yourself you will catch up. You will work late. You will skip the thorough testing. You will figure something out.
Sometimes this works. Often it does not. And when it does not, you have wasted the time that could have been used for course correction. You turned a manageable problem into a crisis.
Take responsibility without excessive apology. When you communicate that you will miss a deadline, own it. Do not blame others. Do not make excuses. But also do not grovel or over-apologize.
What not to say: "It's not my fault, the requirements kept changing" or "I'm so sorry, I'm terrible at this, I should have known better."
What to say instead: "I need to update you on the timeline. Based on what I have learned during implementation, my original estimate of two weeks was too optimistic. My revised estimate is three and a half weeks. The main thing I underestimated was the complexity of the integration with the payment system. Here are some options for how to handle this."
This statement acknowledges the miss, explains why it happened, provides a revised estimate, and offers a path forward. It is professional and constructive rather than defensive or self-flagellating.
Come with options, not just problems. When you bring bad news, also bring potential solutions. Maybe you can deliver a subset by the original deadline and the rest later. Maybe you can parallelize work with help from a teammate. Maybe there is a simpler approach that trades off some functionality for speed.
Having options shows that you are thinking about the problem constructively. It gives the decision maker something to decide rather than just something to be upset about.
How to Recover After an Estimation Failure
Let's say the worst has happened. You gave a bad estimate, did not communicate early enough, missed the deadline badly, and your credibility is damaged. What now?
Acknowledge the failure explicitly. In your next one-on-one with your manager, address it directly. "I want to talk about the Project X timeline. I know my estimate was significantly off and that caused problems. I have been thinking about what went wrong and how to prevent it in the future."
This is uncomfortable but important. Pretending it did not happen does not make people forget. Addressing it directly shows maturity and self-awareness.
Conduct a personal post-mortem. Figure out specifically what went wrong. Was it the planning fallacy making you optimistic? Did you estimate the work but not the overhead? Did requirements change in ways you should have anticipated? Did you fail to communicate early when you saw problems?
Understanding the specific failure mode helps you prevent it in the future. Generic "I'll do better" commitments are worthless. Specific "I'll add 30% buffer for integration tasks because I consistently underestimate those" plans actually help.
Start rebuilding with small wins. You cannot rebuild credibility with one big success. You rebuild it with many small accurate estimates over time. In the weeks after a failure, pay extra attention to your estimates. Be slightly conservative. Beat your commitments rather than missing them.
Over time, the pattern of recent success overwrites the memory of past failure. But this takes consistent effort over months, not weeks.
Understand that recovery is possible. I have seen developers come back from significant estimation failures to become the most trusted estimators on their teams. The key is treating the failure as information rather than identity. You made a mistake. You learned from it. You changed your approach. This is growth, and people respect growth.
Estimation in the Age of AI
The rise of AI coding assistants has added a new dimension to estimation challenges. In some ways, AI makes estimation easier. In other ways, it makes it much harder.
AI does not make implementation time predictable. If anything, it increases variance. Sometimes AI generates exactly what you need and you ship in an hour. Sometimes AI generates plausible nonsense that takes a day to debug. The time required depends on whether AI happens to handle this particular task well, which you often cannot predict in advance.
Stakeholders often underestimate what AI cannot do. When non-technical people hear about AI coding assistants, they sometimes imagine that software development is now trivially fast. "Can't you just use AI?" becomes a question that implies your estimates should be much shorter.
What to say when AI expectations are unrealistic: "AI is helpful for certain types of tasks like boilerplate and routine implementations. This task involves complex business logic and integration with our existing systems, where AI needs significant human guidance and review. I have already factored in AI assistance in my estimate."
This educates without being condescending. It shows you are using AI appropriately while setting realistic expectations about what it can and cannot do.
AI-assisted code requires more review time. Experienced developers have noticed that code written with heavy AI assistance often needs more careful review. The code looks correct but contains subtle issues. This review time needs to be in your estimates.
If you are estimating a task where you plan to use significant AI assistance, add buffer for thorough review and debugging of AI-generated code. The time saved in writing may be partially consumed in validating.
Be explicit about AI uncertainty. When giving estimates for tasks where AI assistance is a significant factor, say so. "This estimate assumes AI can help with the data transformation logic. If that turns out to be more complex than AI can handle, add another two days."
This prepares people for variability and explains where your uncertainty comes from. It also demonstrates that you are thinking carefully about how to apply AI rather than either ignoring it or treating it as magic.
Estimates and Career Advancement
The ability to give reliable estimates is one of the key skills that separates senior developers from everyone else. This is not coincidence. Estimation accuracy requires exactly the skills that senior developers need.
Estimation requires understanding the whole system. To estimate accurately, you need to know how the piece you are building fits into the larger whole. You need to anticipate integration issues, dependency conflicts, and architectural constraints. This is systems thinking, and it is a hallmark of senior engineering.
Estimation requires experience with failure modes. The reason senior developers give better estimates is not that they are smarter. It is that they have seen more things go wrong. They know that "simple" integrations can turn into week-long debugging sessions. They know that "quick" database changes require migration scripts, testing, and rollback plans. Experience teaches what optimism forgets.
Estimation demonstrates business awareness. Understanding why estimates matter, how they affect planning, and what the actual needs are behind the request shows that you think beyond code. This business awareness is essential for senior roles and beyond.
Promotion decisions often hinge on reliability. When managers decide who to promote, they ask themselves who they can count on. Developers who consistently deliver what they promise are seen as ready for more responsibility. Developers whose estimates are unreliable are seen as needing more supervision.
If you want to advance your career, improving your estimation skills is one of the highest-leverage investments you can make. It demonstrates maturity, builds trust, and gives people confidence that you can handle larger scope.
Building Your Personal Estimation System
Over time, you should develop a personal system for estimation that accounts for your own biases and patterns. Here is how to build one.
Track your estimates and actuals. For every significant task, record your estimate and the actual time it took. After a few months, you will have data on your own estimation accuracy. Maybe you consistently underestimate front-end work by 50%. Maybe your back-end estimates are accurate but your testing estimates are not. Data reveals patterns that intuition misses.
Identify your consistent biases. Use your tracking data to find patterns. Are you always optimistic about certain types of work? Do you consistently forget about certain categories of overhead? Once you know your biases, you can explicitly correct for them.
Develop personal multipliers. Based on your historical accuracy, create adjustment factors. If your data shows you typically underestimate by 40%, multiply your gut estimates by 1.4. Different types of work might have different multipliers.
Build in explicit buffer for unknowns. Some developers add 20% buffer to every estimate for "things that will go wrong." This is crude but often effective. More sophisticated approaches add different buffers for different types of uncertainty.
Review and refine regularly. Your estimation system should evolve as you gain experience and as your work context changes. What worked at your last job might not work at your current one. Review your accuracy regularly and adjust your approach.
Common Objections and How to Handle Them
When you start giving more realistic estimates, you may encounter resistance. Here is how to handle common objections.
"Your estimate is much higher than I expected." Respond with curiosity rather than defensiveness. "What were you expecting? Maybe we are thinking about different scope, or maybe there are simplifications I have not considered." This opens a conversation rather than a conflict.
"The old developer could do this in half the time." This is often false, but even if true, you are not the old developer. "I can only estimate based on my own capabilities and understanding. If there are tricks or shortcuts I do not know about, I would love to learn them. But I would rather give you a realistic estimate than an optimistic one I cannot meet."
"Can you just give me a rough number?" Be careful here. Rough numbers have a way of becoming committed deadlines. "I can give you a rough range, but I want to be clear that it is very rough. Somewhere between two and six weeks, with significant uncertainty. If you need something more precise, I need more time to investigate."
"We do not have time for padding. Give me the real estimate." This frames conservative estimates as dishonest padding. Counter this framing. "This is the real estimate. It includes realistic time for testing, code review, unexpected issues, and other things that experience tells me always happen. What you might be thinking of as padding I think of as realism."
The Long Game of Estimation Credibility
Estimation credibility is built over years, not weeks. Every estimate you give either adds to or subtracts from your reputation. The goal is to create a track record where people trust your numbers because your numbers have been trustworthy.
This does not mean being perfect. It means being calibrated. When you say something is high risk, it should sometimes be high risk. When you say something is straightforward, it should usually be straightforward. Over time, people learn that your assessments are reliable, even when those assessments include uncertainty.
The developers who master estimation become uniquely valuable. They can be given vague requirements and return realistic plans. They can be trusted with commitments to external customers. They can lead projects with confidence because their projections are believed.
This skill compounds throughout your career. The credibility you build in one job follows you to the next. References mention that you were reliable. Colleagues remember that you delivered what you promised. The reputation becomes part of your professional identity.
Start building that reputation today. Give estimates carefully. Communicate uncertainty honestly. Update early when things change. Take responsibility when you miss. Learn from every data point.
Your future self will thank you.